Hunt Electric built a customized control van for Bolinder’s crusher plant on Stansbury Island, including delivery, set up and commissioning. The customer wanted to get the van set up and running for 30 days, and then do an upgrade onsite with additional motor control and large drives. The timeline for this project was critical for shut down and restart. Due to the remote location our team had to have impeccable planning to make sure all components and materials were onsite for the planned upgrade, minimizing the shutdown period and allowing for the existing plant to continue operation.
Hunt Electric designed and built a Control Module at Ames Construction's Utah Manufacturing facility. This control van, used Man Machine Interfacing technology along with Allen Bradley Intelli-center Motor Control and Compact Logix PLC to provide maximum automation and control. It incorporated traditional start/stop control consoles with a touch screen birds-eye view of the plant to control, monitor and track operation of the plant.
Hunt Electric built and installed a custom control van for Kenny Seng Construction. It includes an Allen Bradley Motor Control, a Control Tower with our patented lift system, Plug and Run capability for both power and motor loads, Positive Pressure HVAC system and PLC controlled Automated start and stop sequencing.